Journals →  The Economics and News of the Global Nuclear Market →  2010 →  #5 →  Back

WORLD NUCLEAR POWER INDUSTRY: CURRENT SITUATION AND FORECASTS
ArticleName Trial Loading of the First Simulation Fuel Assembly at Kudankulam NPP
ArticleAuthor Based on materials by information agencies
Abstract

At the end of April 2010 the reactor of №1 unit of Kudankulam NPP, which is being built by CJSC Atomstroy in India, was loaded with a first trial simulation fuel assembly.

Language of full-text russian
Full content Buy
Back