Journals →
The Economics and News of the Global Nuclear Market →
2010 →
#5 →
Back
Back
WORLD NUCLEAR POWER INDUSTRY: CURRENT SITUATION AND FORECASTS | |
ArticleName | Trial Loading of the First Simulation Fuel Assembly at Kudankulam NPP |
ArticleAuthor | Based on materials by information agencies |
Abstract | At the end of April 2010 the reactor of №1 unit of Kudankulam NPP, which is being built by CJSC Atomstroy in India, was loaded with a first trial simulation fuel assembly. |
Language of full-text | russian |
Full content | Buy |